NordDeltaINDUSTRIAL KNOWLEDGE
← Knowledge base/ Industrial AI
Industrial AI / ENGINEERING GUIDE

Compare AI advice in shadow mode

Measure a recommendation without issuing a plant command.

Before using this guide

Confirm your site, role and source revision. Follow the local procedure and responsible engineer for physical actions.

Study design

  1. Freeze the model and input-data revision.
  2. Record each recommendation with timestamp and confidence or limits.
  3. Observe the operator decision and actual plant outcome separately.
  4. Calculate predeclared forecast and impact metrics with missing-data handling.
  5. Review safety-rule conflicts and false positives with the responsible engineer.

Interpretation

A counterfactual estimate is not a measured production improvement or proof of causality. Do not promote shadow-mode output into control authority without a separate, approved commissioning process.

KEEP WORKING

Need the matching Nexus workspace?

Open the in-app guide for exact controls and instructions without leaving your active task.

Explore Nexus workspaces ↗