A draft fails validation
Turn findings into a corrected, traceable engineering record.
Before using this guide
Confirm your site, role and source revision. Follow the local procedure and responsible engineer for physical actions.
Resolve deliberately
- Read the exact failed field or gate.
- Check the source document and project revision.
- Correct units, required values, list entries and bounded numbers.
- Confirm predecessor evidence is reviewed for the same revision.
- Submit a new corrected record if the previous record is immutable.
Check before proceeding
- Do not change a value merely to make a gate green.
- Do not substitute a narrative claim for missing external test evidence.